Woolworths, Laborie, Paarl

Project: Woolworths Laborie, Paarl (Western Cape) Main Contractor: Remey Construction Contracts Manager or Remey: Charl Bruce Supplier: Lafarge (Artevia) Architects: R&L Architects This floor was cast our experienced Concrete Placing and Finishing Team. The concrete was cast as a 60mm-80mm thick bonded overlay, on top of the existing concrete surface. For diamond polished concrete to …

TAVCOR AUDI – Port Elizabeth

Project: TAVCOR AUDI, WILLIAM MOFFAT, PORT ELIZABETH – WORKSHOP FLOOR Main contractor: SBT Construction Architect: Lukas Nel, Winterbach Pretorius Letele (WPL) Architects  The floor is a 30Mpa, 70mm overlay, cast on top of a suspended basement slab. It has a Light Grey, dry-shake floor hardener that is applied to the surface, while the concrete is …

New 4500m2 VW Body Shop – Uitenhage, South Africa

NEW Body Shop 2015 / 2016 Project Client: Volkswagen South Africa Engineer: Aurecon Consulting Engineers Contractor: Chris Howes Construction CHC-SA Details of the Project This project was a 4500m2 upgrade of an existing Tool Room for VWSA (Uitenhage) The existing structure was originally built over a concrete external hardstand which was to falls. The floor …

Dainfern Shopping Mall – Gauteng

Two series of pictures in this post identify the work done by CHC-SA at the newly erected Dainfern Shopping centre in Gauteng. Cement flooring throughout the shopping centre were cast and polished by our teams in Gauteng. CHC-SA also cast and polished the Woolworths retail store within the centre. Pictures of this work are also visible …

Autotrust – Port Elizabeth

Autotrust – Port Elizabeth Executive Car Body Repair Company The job entailed placing 900 square meters of concrete and diamond polishing afterwards in order to get the finish visible in the photographs. The job took approximately 5 weeks from start to completion. Manager – Adrian Graham

Makro Montague – Concrete Floor

• The floor was cast using our SXP Laser screed in 12 days • Dry Shake Floor Hardener – Light Grey supplied by BASF • The Main Contractor was Grinaker / LTA • Concrete supplied by Afrisam Watch some videos of CHC in action Video 1 1 Atomising prewetting of sub base from Alan Ahlfeldt …